Acreage: 1196,31 km2; 295,614 acres
Concession blocks: 8, 9, 28, 29, 48
Coordinates
No. point | x [PUWG92] | y [PUWG92] |
1 | 771 897,16 | 460 194,76 |
2 | 759 982,46 | 460 170,68 |
3 | 765 579,52 | 435 528,73 |
4 | 737 770,93 | 435 133,01 |
5 | 737 990,19 | 421 224,49 |
6 | 735 907,85 | 421 189,09 |
7 | 736 256,30 | 408 926,76 |
8 | 768 487,61 | 409 502,87 |
9 | 772 231,87 | 439 423,09 |
10 | 772 033,57 | 440 000,36 |
11 | 770 857,64 | 440 606,96 |
12 | 770 407,94 | 439 504,45 |
13 | 771 004,54 | 438 913,46 |
14 | 771 752,40 | 439 266,55 |
15 | 774 424,37 | 441 529,93 |
16 | 774 381,37 | 442 018,82 |
17 | 774 551,65 | 442 172,85 |
18 | 774 539,40 | 443 143,54 |
19 | 774 283,04 | 443 194,83 |
20 | 773 624,84 | 442 507,10 |
21 | 773 019,03 | 442 639,32 |
22 | 773 019,18 | 442 259,58 |
23 | 773 899,02 | 441 574,91 |
24 | 772 703,05 | 443 152,56 |
25 | 772 306,98 | 444 687,69 |
26 | 771 183,32 | 445 342,35 |
27 | 770 953,68 | 445 204,07 |
28 | 771 028,96 | 444 069,60 |
29 | 771 317,36 | 443 120,54 |
Location
Pomorskie province:
- Lębork county, communes: Nowa Wieś Lęborska (participation in the concession block 20,22%), Łeba (0,35%), Lębork (1,49%), Cewice (1.28%), Wicko (12.29%)
- Puck county, communes: Puck urban. (0.01%), Puck (7.31%), Władysławowo (2.40%), Krokowa (15.38%)
- Słupsk country, communes: Potęgowo (0.02%), Główczyce (0.35%)
- Wejherowo country, communes: Gniewino (7.70%), Choczewo (15.30%), Łęczyce (15.91%)
Duration
Concession for 10 years, including:
- prospecting and exploration phase (5 years)
- extracting phase - after the investment decision
Petroleum play
I – Conventional in the Middle Cambrian, Zechstein/Main Dolomite
II – Unconventional in the Lower Palaeozoic (Middle and Upper Cambrian, Ordovician, Silurian)
Reservoir rocks
I – Middle Cambrian sandstones, Rotliegend sandstones, Zechstein/Main Dolomite carbonates
II – Upper Cambrian, Ordovician, Silurian claystones and mudstones
Seal rocks
I, II – Upper Cambrian, Ludlovian and Pridoli (Silurian) claystones and mudstones (secondary sealing complex), Zechstein evaporites
The proposed minimum work program of prospecting and exploration phase
Stage I (12 months) – reprocessing and reinterpretation of archival seismic 2D data and geological data
Stage II (36 months) – drilling of one exploration well to 5,000 m (TVD) with obligatory coring of perspective intervals and full set of geophysical data allowing to interpret lithology, saturation and petrophysical properties as well as to ensure safety during the drilling process. In the case of discovery – performance of production tests and determination of exploitation parameters. Drilling second exploration well to 5,000 m (TVD) with obligatory coring of perspective intervals and full set of geophysical data allowing to interpret lithology, saturation and petrophysical properties as well as to ensure safety during the drilling process. In the case of discovery – performance of production tests and determination of exploitation parameters
Stage III (12 months) – analysis of obtained data