Acreage: 669.11 km2; 165,340 acres
Concession block: 106
Coordinates
No. point | x [PUWG92] | y [PUWG92] |
1 | 655747,74 | 368036,30 |
2 | 635495,40 | 367464,85 |
3 | 636550,88 | 334376,60 |
4 | 656786,04 | 335085,46 |
Location
Pomorskie province:
- Człuchów county, communes: Czarne (17.26% powierzchni), Rzeczenica (3.37%)
Wielkopolskie province:
- Złotów county, commune: Okonek (powierzchnia 12.77%)
Zachodniopomorskie province:
- Szczecinek county, communes: Szczecinek (38.51%), Borne Sulinowo (20.45%), urban Szczecinek (7.24%), Grzmiąca (0.21%), Barwice (0.17%), Biały Bór (0.02%)
Duration
Concession for 10 years, including:
- prospecting and exploration phase (5 years)
- extracting phase - after the investment decision
Petroleum play
I – Devonian
II – Carboniferous-Permian/Rotliegend
III – Permian (Zechstein/Main Dolomite)
Source rocks
I – (hypotetic) Lower Paleozoic and/or Devonian fine-grained clastics
II – Lower Carboniferous and Devonian fine-grained clastics
III – Main Dolomite organic rich interbeds
Reservoir rocks
I – Upper Devonian carbonates
II – Lower Carboniferous and Rotliegend sandstones
III – Main Dolomite carbonates
Seal rocks
I – Carboniferous fine-grained clastic rocks and Zechstein evaporites
II, III – Zechstein evaporites
Trap type
I – structural, lithological
II – structural, structural-stratigraphic, lithological
III – structural, lithological
The proposed minimum work program of prospecting and exploration phase
Stage I (12 months) – reprocessing and reinterpretation of archival seismic 2D data and interpretation and analyses of other archival geological data
Stage II (12 months) – execution of 2D seismic survey (80 km) or execution of 3D seismic survey (50 km2)
Stage III (24 months) – drilling of one well to the minimum depth of 4200 m and maximum depth of 6000 (TVD), with obligatory coring of perspective intervals and geophysical survey for petrographic and lithological analyses, hydrocarbon saturation and ensuring security during geological work. In case of deposit discover – performing of production tests and preparing to exploitation
Stage IV (12 months) – analysis of the obtained data